What is a stormwater detention basin and how does it work?
A stormwater detention basin (also called a retention or attenuation basin) is a civil engineering structure designed to store excess runoff temporarily during heavy rainfall. As more ground is sealed by buildings and paving, its main purpose is to control the discharge rate to the drainage network or watercourse – or to return water to the ground by infiltration – in order to prevent network overload, flooding, soil erosion and sewer overflows. It acts as a buffer between the impermeable surface and the outfall. In current design practice, detention basins are part of an integrated approach to stormwater management: infiltrate as close as possible to where the rain falls when the soil allows it, then store and control the rest.
What types of stormwater detention basins are there?
Detention basins fall into two main categories: open structures (landscaped ponds, infiltration swales) and underground structures (concrete tanks, oversized pipes or geocellular storage systems). The choice depends on the land available, soil conditions, construction cost and the objective – whether groundwater recharge by infiltration or simple storage with controlled discharge.
For underground structures, the wrapping depends on the function: a geotextile prevents fine soil particles from entering an infiltration basin, while an impermeable geomembrane is used for an attenuation tank with controlled discharge or a rainwater harvesting tank.
Comparison of solutions
| Basin type | Advantages | Drawbacks | Typical use |
|---|---|---|---|
| Landscaped pond (open) | Ecological value, low cost | Large land take, vegetation maintenance | Eco-districts, rural areas |
| Underground concrete tank | Surface can be reused, very durable | High civil engineering cost and lead time, heavy | Dense urban areas, commercial sites |
| Geocellular storage system | Fast installation, void ratio up to 95%, surface can be reused (car park, green space), lightweight | Pre-treatment and maintenance access must be designed in from the start (jettable diffusion channel or inspectable modules) | Car parks, industrial sites, housing developments, town centres, retail parks |
How do you calculate and size a stormwater detention basin?
A detention basin is usually sized by comparing the inflow from a design storm with the permitted outflow, using local design rainfall data and the rules set by the local authority or drainage body. The calculation takes into account the impermeable area of the project, the runoff coefficient (C) and the rainfall for a given return period (typically 10, 30 or 100 years). The required volume V is the maximum difference between the volume of water brought in by the storm and the volume discharged at the permitted rate.
Key steps to size a detention basin
- Calculate the contributing area (Ac = A × C): weight the gross area by the runoff coefficient of each surface type.
- Set the maximum discharge rate (Qmax): the limit accepted by the network operator or local authority.
- Analyse the time of concentration (tc) and IDF curves: assess the local intensity-duration-frequency rainfall data.
- Calculate the effective storage volume: the minimum volume to be provided.
- For an infiltration basin: measure soil permeability, check the groundwater level and the half-emptying time, and provide an overflow.
Regulations: what should you check before designing a basin?
In most countries, stormwater management for new developments is regulated at national and local level. Requirements typically cover the maximum discharge rate (often expressed in litres per second per hectare), the design return period, the treatment of runoff before infiltration or discharge, and – for larger catchments – a permit or prior notification to the environmental authority. Some local authorities require on-site management with no discharge to the public network.
Requirements vary widely from one country and one municipality to another: check the applicable rules with the local authority, water board or drainage authority at the earliest design stage.
How do you maintain a detention basin and control pollution?
Regular maintenance is essential to keep the storage capacity and prevent pollution of groundwater and watercourses. Key operations include periodic cleaning and jetting to remove sediment and suspended solids, maintenance of pre-treatment devices (screens, silt traps and, where specified, oil separators), and checking flow control devices such as vortex flow controls or orifices.
Maintenance checklist (indicative frequencies)
- Monthly / after major storms: visual inspection of grates, removal of debris and floating material.
- Once or twice a year: emptying of silt traps and oil separators, where fitted.
- Every 5 to 10 years: full removal of sediment accumulated at the bottom of the basin to preserve storage and infiltration capacity.
For underground geocellular basins, maintenance is carried out by CCTV inspection and jetting from the chambers. With the Nidaplast EP range, only the external diffusion channel needs to be inspected and jetted; with Optibox, the modules can be inspected and jetted at every level.
What affects the cost of a stormwater detention basin?
The cost of a detention basin depends above all on the project:
- the storage volume and the function of the structure (infiltration, attenuation or rainwater harvesting);
- soil conditions, depth and groundwater level, which determine the excavation works;
• surface loads (green space, car park, road) and cover depth; - the wrapping (geotextile or geomembrane), pre-treatment and flow control devices;
- operating costs: a structure that is easy to inspect and jet reduces maintenance costs over its whole service life.