Lightweight fill on civil engineering structures

Reducing lateral earth pressures and managing water on a bridge structure

Discover how Nidaplast RA honeycomb blocks enabled the construction of a high-performance lightweight embankment on the abutments of the Leuge viaduct in Haute-Loire (France).
An innovative solution combining mechanical strength, low density and optimal water management, while limiting lateral pressures on the structure.

10 meters

height of abutments

6,000 m3

lightweight fill volume

100 m3

installed per worker/day

Project Context and Challenges

Limiting lateral and vertical pressures on the viaduct abutments

During the design of a civil engineering structure, engineering teams must anticipate multiple factors:

  • loads applied to the structure,
  • lateral earth pressures,
  • differential settlements,
  • behaviour of the supporting soil.

For the Leuge viaduct, built near a river subject to flooding and rising groundwater, water-related risks were critical.

Identified technical constraints:

  • Risk of saturation with traditional fill materials (soil, GNT, sand)
  • Need to limit lateral pressures on abutments
  • Management of runoff and vertical drainage during heavy rain
  • Tight construction deadlines

Solution Implemented with Nidaplast

Nidaplast RA honeycomb blocks – lightweight polypropylene embankment

Nidaplast RA blocks were chosen for their very low density (50 times lighter than traditional fill) and their high mechanical strength.
Made of 95% void, they function as a draining and hydraulically transparent embankment, reducing stresses applied to the structure.

Advantages in this context:

  • Significant reduction of lateral loads on abutments
  • Natural drainage thanks to the honeycomb structure: water flows freely through the cells
  • High mechanical strength: 500 kPa uniaxial compression
  • Easy installation: lightweight blocks, no connectors, no compaction required

Technical Characteristics of the Installed Product

Block height:

520 mm

Dimensions:

2400 x 1200 mm

Weight per block:

60 kg

Dry density:

40 kg/m3

Material:

Recyclable polypropylene

Nidaplast RA

Nidaplast RA

Nidaplast RA lightweight embankments are extremely light and resistant. These honeycomb structures are the recommended solution for constructing landscape embankments, road embankments, or building embankments.

View product sheet

Installation Process

1. Earthworks

Excavation and preparation of a regular formation layer, covered with an anti-contamination geotextile.

2. Laying the blocks

Placement of Nidaplast RA blocks in cross-bond pattern, both longitudinally and transversely.

3. Intermediate layer

Installation of a 30 cm GNT intermediate layer, covered with geotextile before continuing with block installation.

4. Second embankment stage

Installation of the second layer of RA blocks, followed by GNT and—depending on traffic class—by a reinforced concrete slab ensuring adequate bearing capacity for the future pavement.

Watch the installation video

Results and Benefits Observed

  • Major reduction of lateral and vertical pressures on the viaduct abutments

  • Optimal water management: infiltration and natural drainage through the Nidaplast RA honeycombs

  • Significant time savings (no compaction), lightweight and easy-to-handle solution

  • Improved long-term durability of the structure and reduced settlement risks

remblai allégé sur culée de pont terminé
massif de blocs alvéolaires pour remblai allégé
second massif de remblai allégé sur culée de pont

Faites circuler l’info ! Partagez cet article

Vous avez un projet similaire à nous partager ?
C’est par ici !